Rock Armour

back

Klaipeda Port Project

Production and supply of over 300,000 tonnes of different grades of armourstone up to 25ton size for new protection layers on the breakwaters of Klaipeda port.

Transport from quarry to the project was performed by using our dedicated Stema Barge 2 flat top rock barge, having a capacity of 24,000 tonnes.

Facts:

Owner: Port of Klaipeda
Customer: HERBOSCH-KIERE
Construction time: 2022
Delivery quantity: 380.000 Tons of Rock Armour various gradings raging from 0,1-25 Tons.
Source: Norway
Logistics Stema Barge II and 3rd party vessels/barges
Purpose of use: Extension and repair of port break waters