AIRBUS extension at Finkenwerder (Germany)

The European Airbus A380 project was to come to Hamburg, so the Hamburg ReGe accomplished the largest industrial expansion the city had ever seen: extending the Airbus facilities in the Mühlenberger Loch river terrain and lengthening the runway.

In detail...

  • 170 ha reclaimed land
  • 12 million m³ of sand shipped in
  • Raising the land by 5 metres
  • Lengthening the runway by 589 metres to the south and 309 metres to the north
  • Broadening the runway from 45 to 60 metres
  • Extending safety areas from 100 to 150 metres
AIRBUS extension at Finkenwerder, Realisierungsgesellschaft Finkenwerder mbH

Facts:

Owner: Airbus Deutschland GmbH
Customer: Realisierungsgesellschaft Finkenwerder mbH
Construction time: Feb 2001 – 2007
Construction cost: €694 million
Sub contractor: Mibau Baustoffhandel GmbH
Delivery quantity: 1.1 million tonnes
Purpose of use: Runway extension