backAIRBUS extension at Finkenwerder (Germany)
The European Airbus A380 project was to come to Hamburg, so the Hamburg ReGe accomplished the largest industrial expansion the city had ever seen: extending the Airbus facilities in the Mühlenberger Loch river terrain and lengthening the runway.
In detail...
- 170 ha reclaimed land
- 12 million m³ of sand shipped in
- Raising the land by 5 metres
- Lengthening the runway by 589 metres to the south and 309 metres to the north
- Broadening the runway from 45 to 60 metres
- Extending safety areas from 100 to 150 metres
![](/Projects/AIRBUS%20extension%20at%20Finkenwerder%20%28Germany%29/273/image-thumb__273__ProjectDetailGrid/p-airbus1.adc51be7.jpg)
![](/Projects/AIRBUS%20extension%20at%20Finkenwerder%20%28Germany%29/274/image-thumb__274__ProjectDetailGrid/p-airbus2.c6b13bce.jpg)
![](/Projects/AIRBUS%20extension%20at%20Finkenwerder%20%28Germany%29/275/image-thumb__275__ProjectDetailGrid/p-airbus3.c0badca9.jpg)
AIRBUS extension at Finkenwerder, Realisierungsgesellschaft Finkenwerder mbH
Facts:
Owner: | Airbus Deutschland GmbH |
---|---|
Customer: | Realisierungsgesellschaft Finkenwerder mbH |
Construction time: | Feb 2001 – 2007 |
Construction cost: | €694 million |
Sub contractor: | Mibau Baustoffhandel GmbH |
Delivery quantity: | 1.1 million tonnes |
---|---|
Purpose of use: | Runway extension |